Sewage Lagoon Control Structure Replacement

Talbera was retained by the Town of Pincher Creek to provide design, coordination, project management and construction services to upgrade severely degraded control structures in the sewage lagoons in Pincher Creek.

The scope of work includes surveys design, preparation of tender drawings and specifications, contract administration, construction inspections and management.

http://talbera.com/wp-content/uploads/2017/03/P1060654.jpg
P1060654
http://talbera.com/wp-content/uploads/2017/03/P1070494.jpg
P1070494
http://talbera.com/wp-content/uploads/2017/03/P1070123.jpg
P1070123
http://talbera.com/wp-content/uploads/2017/03/P1060828.jpg
P1060828

No Comments Yet.

Leave a comment