Lee Creek Bank Failures

Town of Cardston retained Talbera to provide planning, design, project management, coordination and construction services to install bank protection at six locations prone to erosion threatening local infrastructure on the banks of the Lee Creek in Cardston, Alberta.
The scope of work included: Bank protection design, preparation of tender drawings and specifications, contract administration, coordination, construction inspections and management.

http://talbera.com/wp-content/uploads/2017/03/20160826_121019.jpg
20160826_121019
http://talbera.com/wp-content/uploads/2017/03/IMG_20160906_115448538.jpg
IMG_20160906_115448538
http://talbera.com/wp-content/uploads/2017/03/IMG_20160822_171814265.jpg
IMG_20160822_171814265
http://talbera.com/wp-content/uploads/2017/03/IMG_20161007_135833744_HDR.jpg
IMG_20161007_135833744_HDR

Comments are closed.