BTPW – Standoff Waste Water System Upgrades

Talbera was retained by Blood Tribe Public Works to upgrade the existing DIA250 sanitary forceman, from the Standoff Water Treatment Plant to the Standoff Wastewater Lagoons.

This project includes two kilometres of new HDPE forcemain, air valve structures, and a new vault chamber and appurtenances to tie to the existing lagoons.

http://talbera.com/wp-content/uploads/2017/03/P1080176.jpg
P1080176
http://talbera.com/wp-content/uploads/2017/03/P1060566.jpg
P1060566
http://talbera.com/wp-content/uploads/2017/03/IMG_20161019_163119530_HDR.jpg
IMG_20161019_163119530_HDR
http://talbera.com/wp-content/uploads/2017/03/P1080317.jpg
P1080317

No Comments Yet.

Leave a comment